The dispatcher’s first plan
Stores are split across the trucks in list order, so routes criss-cross the city and the plan breaks its limits: the 6W (A) needs 4h 09m for a 3-hour shift, and the 4W (C) carries 1,670 kg, over its 1,200 kg limit.
Drag to rotate · hover a store · Taller store = more kg · can’t be served
Hover or tap a truck to highlight its route.
Planning 10,000 deliveries a day means deciding which vehicle serves each store and in what order, while staying within vehicle capacity and service requirements. At SWAT Mobility, I worked with the Operations team to replace manual planning with an automated approach.
I used clustering to group delivery stops and route optimization to plan how vehicles would serve them. The work reduced planning time by 70% and operational cost by 8%, balancing efficiency with the requirements of the delivery operation.
- 70%
- less planning time
- 8%
- lower operational cost
- 10,000
- deliveries planned per day